company logo

Help center

Go to AdLabs
All collectionsGeneral Help DocumentationHow to Set Up & Use Dayparting in AdLabs

How to Set Up & Use Dayparting in AdLabs

A guide to creating dayparting schedules, understanding how they work with bids, and what to expect once a schedule is active.

How to Set Up Dayparting in AdLabs

Everything you need to know about setting up dayparting is in the video below. We highly recommend starting here!

Dayparting Analyze Tab

AdLabs now automatically pulls in your hourly data directly from Amazon. More info on that in the article below.

How to Use the AdLabs Dayparting "Analyze" Tab

How AdLabs analyzes hourly and daily performance data to suggest bid adjustments for dayparting.

Common Dayparting Scheduling Questions

info icon
NOTE: Paused campaigns can be added to a dayparting schedule, but dayparting ignores them until they are enabled. Archived, ended or ending within 7 days, Sponsored TV, Full-Funnel, Review Requests, legacy Sponsored Brands, global and report-only campaigns cannot be dayparted, and neither can fixed-price campaigns or campaigns with an Amazon optimization rule or cost control that blocks bid changes.

A few things to know about schedule setup:

  • Deployment time: New schedules deploy at the top of the next hour after creation.

  • One schedule per campaign: Each campaign can only belong to one dayparting schedule at a time. If a campaign is already on another schedule, AdLabs won't add it to a new one until you remove the existing assignment (which resets its bids). When you create a schedule from the Analyze tab, campaigns already on another schedule start unselected; selecting one moves it to the new schedule.

  • Pausing and reactivating: If a campaign is paused and later re-enabled, it stays in its dayparting schedule. You do not need to re-add it.

  • vCPM campaigns: Dayparting does work with vCPM campaigns, but you need to make sure there are no enabled cost control settings within Campaign Manager, as those can interfere with bid changes.

How Dayparting Affects Your Bids

Once a dayparting schedule is active, here's what you need to know about how it interacts with your bids and other campaign settings:

  • Only bids are affected. Dayparting adjusts keyword and product target bids. No other campaign settings (placements, budgets, titles etc.) are changed.

  • Dayparted bids are not used in the optimizer. AdLabs stops syncing bids from the Amazon Ads console for campaigns with dayparting enabled. This allows you to edit the base bids within AdLabs while avoiding any syncing conflicts.

  • Making bid changes while dayparting is active: If you want to adjust bids on a campaign that has dayparting enabled, make those changes inside AdLabs through the targeting tab. Changes made directly in Amazon will be overwritten at the top of the hour when dayparting rules update.

warning icon
There is a banner warning displayed in AdLabs when dayparting is active on a campaign, reminding you that manual changes in the Amazon console will be overwritten. If a dayparted bid doesn't appear to be reverting correctly, it's most likely because a manual adjustment was made in the Amazon console.

Time Zones

Dayparting schedules run in the time zone of the Amazon profile, not the sync time you've selected in AdLabs. For all US Amazon accounts, this will display as PST.

More details on time zone in the help doc below.

Understanding Timezones and Dayparting Schedules in Amazon Advertising

Which timezone should I use for dayparting schedules in AdLabs?

Viewing Dayparting Bid Changes in Amazon

Dayparting bid changes from AdLabs will not appear in a campaign's "History" tab within the Amazon Ads console. This is because the Campaign History tab does not show bid change history.

To see dayparting bid changes, you have two options:

  • Navigate to an Ad Group within the campaign and check the Ad Group history to see bid changes.

  • View dayparting bid changes across all campaigns at once using the Account level history tab.

Did this answer your question?
😞
😐
😁